Traffic reports that help your DA through council.
Traffic impact assessments, car parking assessments, council RFI responses, swept path analysis, CTMPs and TGS for developers, town planners, architects and builders across Australia.
Get a fixed quote
Tell us the address, council and what you need – DA report, council RFI, CTMP or TGS.
Traffic and parking services for Australian projects
From the first traffic statement to the last council question, we prepare clear, defensible reports to Austroads guidelines, Australian Standards and your council’s controls.
Traffic Impact Assessments
Trip generation, intersection performance and site access for development applications, subdivisions and planning proposals.
Car Parking & Access Assessments
Parking rates against your council’s DCP, AS 2890.1 and AS 2890.2 compliance, ramps, aisles, loading and servicing.
Council RFI & Submission Responses
Clear answers to council’s traffic, parking and access questions, and to neighbour submissions during exhibition.
Swept Path Analysis
Vehicle turning checks for B85/B99 cars, SRV, MRV, HRV, waste trucks and fuel tankers at driveways, ramps and loading docks.
CTMP & Traffic Guidance Schemes
Construction traffic management plans and TGS to AS 1742.3 and the Austroads Guide to Temporary Traffic Management.
SIDRA & Traffic Modelling
SIDRA intersection and network models, queue and delay checks, and microsimulation in PTV Vissim where a project needs it.
A dependable traffic team behind your application
We work directly for developers and builders, or behind the scenes for town planners, architects and traffic consultancies who need extra capacity.
Developers & Builders
Traffic and parking reports for your DA, then the CTMP and TGS once consent is issued.
Town Planners
A traffic sub-consultant for your lodgements, with reports in your format, ready to lodge under your cover.
Architects
Car park layouts, ramps, loading bays and swept paths that fit your design before it goes to council.
Traffic Consultancies
White-label drafting, SIDRA models, swept paths and CTMP/TGS sheets in your templates. You keep the client.
Who signs your plans and reports
Our engineering team works from Lahore, Pakistan, on Australian business hours. Where a document needs an Australian accreditation, we tell you up front who signs it:
- NSW – TGS and work-zone traffic management plans signed by our NSW-accredited associate
- QLD – reports reviewed and signed by your nominated RPEQ
- VIC – work prepared under your nominated accredited traffic engineer
Recent projects and samples
Traffic impact, simulation, swept path and temporary traffic management work by our team.
Roadworks & Pedestrian Management TGS
15 m works area with single-lane stop/slow, a 1.2 m protected pedestrian walkway, water-filled barriers and signage to AS 1742.3.
Site Access & Traffic Control TGS
Temporary site access and traffic control for a 20 m works zone on a busy arterial road, with cone tapers and signage layout.
Truck Parking Facility
Swept path analysis for articulated and tandem-trailer trucks, validating layout, circulation, access and egress.
Saudi German Hospital – TIA
Patient, staff and emergency access, parking demand and surrounding road capacity for a major hospital.
Simple process, fixed price
Send the plans
Email the architectural plans, the address and council’s letter if there is one.
Fixed quote
We confirm the scope, sign-off and a fixed price in AUD before any work starts.
Report & drawings
Your report, swept paths or TGS, checked by a senior traffic engineer before it reaches you.
Council follow-up
Revisions included until council’s traffic comments are closed.
Council asked for a traffic report or more information?
Send us the plans or council’s letter. We’ll come back with the scope, who signs, and a fixed quote.
Guidance for Australian projects
What council expects in a traffic impact assessment
The items council’s engineers look for, and how to avoid an RFI.
Read articles →AS 2890 checks before you lodge
Ramps, aisle widths and swept paths that commonly trigger council questions.
Read articles →CTMP and TGS: what consent conditions ask for
Planning construction traffic early so works start on time.
Read articles →Let’s talk about your project
Email us or use the quote form at the top of this page.
